


{"id":755436,"date":"2026-07-06T14:09:13","date_gmt":"2026-07-06T17:09:13","guid":{"rendered":"https:\/\/arqa.com\/?p=755436"},"modified":"2026-07-06T14:09:13","modified_gmt":"2026-07-06T17:09:13","slug":"redmond-airport-terminal-expansion","status":"publish","type":"post","link":"https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html","title":{"rendered":"Redmond Airport Terminal Expansion"},"content":{"rendered":"<p>Reflecting and responding to the region\u2019s dramatic landscape and distinct character, the design celebrates the natural beauty that draws residents and visitors alike. The expanded airport creates a welcoming sense of place and a calm, comfortable environment that elevates the passenger experience.<\/p>\n<p>RDM\u2019s location in the high desert offers stunning views for miles, which drove the use of a full curtainwall envelope \u2014 expansive windows frame the Cascade Mountain Range, dramatic volcanic outcroppings, and rugged sagebrush and juniper plains. A carefully calibrated daylighting strategy balances natural light with glare control and thermal comfort. The exterior features a distinct Cascade mountains motif created by solar shade fins, which are central to the design: they not only enforce the regional identity but mitigate against the inherent challenges of extensive glass. In addition to the fins and standard gate backwalls, perforated solar screens protect agent workstations from the most intense sun. Natural forms continue in the floor terrazzo with a geographic pattern of the Deschutes River, accentuated with subtle color variation that represents the water\u2019s depth and flow. Mass timber in the roof and ceiling structure brings warmth to the terminal.<\/p>\n<p>Rather than reacting to growth, the design anticipates it \u2014 providing an adaptable framework that protects today\u2019s investment while enabling confident, uninterrupted growth. The current expansion adds more than 80,000 square feet to one end of the existing terminal, including a new second-level concourse with seven boarding bridges, greatly expanded holdrooms, and in-demand seating and concessions. To set RDM up for future expansion in the other direction, the layout is intentionally simple, streamlining movement between old and new and allowing for easy build-out of systems.<\/p>\n<p>Designed in partnership by Hennebery Eddy Architects and RS&amp;H and constructed by Skanska, the expansion will improve performance and reshape expectations for regional airports. Passengers can look forward to a much larger airport that feels intuitive and inviting yet preserves the convenience they value at RDM, transforming travel into a memorable experience. Construction is expected to be completed by early 2028.<\/p>\n<p>[info]<strong>Redmond Airport Terminal Expansion<\/strong><br \/>\n<strong>Architecture and Interiors<\/strong>: Hennebery Eddy Architects and RS&amp;H<br \/>\n<strong>Location<\/strong>: Redmond, Oregon; USA<br \/>\n<strong>CMGC<\/strong>: Skanska USA<br \/>\n<strong>Civil Engineer<\/strong>: Morrison-Maierle<br \/>\n<strong>Structural Engineer<\/strong>: Morrison-Maierle<br \/>\n<strong>MEP Engineer<\/strong>: Morrison-Maierle<br \/>\n<strong>Public Address\/Acoustics<\/strong>: Avant Acoustics<br \/>\n<strong>Signage\/Wayfinding<\/strong>: Mayer\/Reed<br \/>\n<strong>LEED\/Sustainability<\/strong>: Group 14 Engineering<br \/>\n<strong>Solar\/Sustainability<\/strong>: OurEnergy<br \/>\n<strong>Baggage Handling<\/strong>: BNP Associates<br \/>\n<strong>Cost Estimating<\/strong>: Construction Focus, Inc.<br \/>\n<strong>Renderings<\/strong>: RS&amp;H and Hennebery Eddy Architects[\/info]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>To meet the exploding demand for travel through Central Oregon\u2019s primary airport, a $180M terminal expansion is underway to double capacity at Redmond Municipal Airport.<\/p>\n","protected":false},"author":122769,"featured_media":755440,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1004332],"tags":[],"class_list":["post-755436","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-architecture","tipologias-airports","paises-estados-unidos-de-america-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Redmond Airport Terminal Expansion &#8211; ARQA<\/title>\n<meta name=\"description\" content=\"To meet the exploding demand for travel through Central Oregon\u2019s primary airport, a $180M terminal expansion is underway to double capacity at Redmond Municipal Airport.\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:locale\" content=\"en_US\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:type\" content=\"article\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:title\" content=\"Redmond Airport Terminal Expansion &#8211; ARQA\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:description\" content=\"To meet the exploding demand for travel through Central Oregon\u2019s primary airport, a $180M terminal expansion is underway to double capacity at Redmond Municipal Airport.\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:url\" content=\"https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:site_name\" content=\"ARQA\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/arqa.arquitectura\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-06T17:09:13+00:00\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:image\" content=\"https:\/\/arqa.com\/wp-content\/uploads\/2026\/07\/3-a05-airside-aerial-west-without-copyright-r4-scaled.jpg\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"author\" content=\"Skydan\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:creator\" content=\"@arqa_com\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:site\" content=\"@arqa_com\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:data1\" content=\"Skydan\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" class=\"yoast-seo-meta-tag\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/redmond-airport-terminal-expansion.html#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/redmond-airport-terminal-expansion.html\"},\"author\":{\"name\":\"Skydan\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/1bd66c2185accb93bf4a1eab26833867\"},\"headline\":\"Redmond Airport Terminal Expansion\",\"datePublished\":\"2026-07-06T17:09:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/redmond-airport-terminal-expansion.html\"},\"wordCount\":405,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/redmond-airport-terminal-expansion.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/3-a05-airside-aerial-west-without-copyright-r4-scaled.jpg\",\"articleSection\":[\"Architecture\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/redmond-airport-terminal-expansion.html#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/redmond-airport-terminal-expansion.html\",\"url\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/redmond-airport-terminal-expansion.html\",\"name\":\"Redmond Airport Terminal Expansion &#8211; ARQA\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/redmond-airport-terminal-expansion.html#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/redmond-airport-terminal-expansion.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/3-a05-airside-aerial-west-without-copyright-r4-scaled.jpg\",\"datePublished\":\"2026-07-06T17:09:13+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/1bd66c2185accb93bf4a1eab26833867\"},\"description\":\"To meet the exploding demand for travel through Central Oregon\u2019s primary airport, a $180M terminal expansion is underway to double capacity at Redmond Municipal Airport.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/redmond-airport-terminal-expansion.html#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/redmond-airport-terminal-expansion.html\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/redmond-airport-terminal-expansion.html#primaryimage\",\"url\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/3-a05-airside-aerial-west-without-copyright-r4-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/3-a05-airside-aerial-west-without-copyright-r4-scaled.jpg\",\"width\":2560,\"height\":1440,\"caption\":\"Redmond Airport Terminal Expansion\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/redmond-airport-terminal-expansion.html#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Architecture\",\"item\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Redmond Airport Terminal Expansion\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#website\",\"url\":\"https:\\\/\\\/arqa.com\\\/\",\"name\":\"ARQA\",\"description\":\"Comunidad de Arquitectura y Dise\u00f1o\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/arqa.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/1bd66c2185accb93bf4a1eab26833867\",\"name\":\"Skydan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"\\\/\\\/www.gravatar.com\\\/avatar\\\/03b4a711f0a5cbc62f753143a2fa7e0c?s=96&#038;r=g&#038;d=http%3A%2F%2Farqa.com%2Fwp-content%2Fuploads%2F2015%2F06%2Fnew-mistery.png\",\"url\":\"\\\/\\\/www.gravatar.com\\\/avatar\\\/03b4a711f0a5cbc62f753143a2fa7e0c?s=96&#038;r=g&#038;d=http%3A%2F%2Farqa.com%2Fwp-content%2Fuploads%2F2015%2F06%2Fnew-mistery.png\",\"contentUrl\":\"\\\/\\\/www.gravatar.com\\\/avatar\\\/03b4a711f0a5cbc62f753143a2fa7e0c?s=96&#038;r=g&#038;d=http%3A%2F%2Farqa.com%2Fwp-content%2Fuploads%2F2015%2F06%2Fnew-mistery.png\",\"caption\":\"Skydan\"},\"sameAs\":[\"https:\\\/\\\/www.instagram.com\\\/skydan_arg\\\/?hl=es\",\"Skydan\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Redmond Airport Terminal Expansion &#8211; ARQA","description":"To meet the exploding demand for travel through Central Oregon\u2019s primary airport, a $180M terminal expansion is underway to double capacity at Redmond Municipal Airport.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html","og_locale":"en_US","og_type":"article","og_title":"Redmond Airport Terminal Expansion &#8211; ARQA","og_description":"To meet the exploding demand for travel through Central Oregon\u2019s primary airport, a $180M terminal expansion is underway to double capacity at Redmond Municipal Airport.","og_url":"https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html","og_site_name":"ARQA","article_publisher":"https:\/\/www.facebook.com\/arqa.arquitectura","article_published_time":"2026-07-06T17:09:13+00:00","og_image":[{"width":2560,"height":1440,"url":"https:\/\/arqa.com\/wp-content\/uploads\/2026\/07\/3-a05-airside-aerial-west-without-copyright-r4-scaled.jpg","type":"image\/jpeg"}],"author":"Skydan","twitter_card":"summary_large_image","twitter_creator":"@arqa_com","twitter_site":"@arqa_com","twitter_misc":{"Written by":"Skydan","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html#article","isPartOf":{"@id":"https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html"},"author":{"name":"Skydan","@id":"https:\/\/arqa.com\/#\/schema\/person\/1bd66c2185accb93bf4a1eab26833867"},"headline":"Redmond Airport Terminal Expansion","datePublished":"2026-07-06T17:09:13+00:00","mainEntityOfPage":{"@id":"https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html"},"wordCount":405,"commentCount":0,"image":{"@id":"https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html#primaryimage"},"thumbnailUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2026\/07\/3-a05-airside-aerial-west-without-copyright-r4-scaled.jpg","articleSection":["Architecture"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html","url":"https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html","name":"Redmond Airport Terminal Expansion &#8211; ARQA","isPartOf":{"@id":"https:\/\/arqa.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html#primaryimage"},"image":{"@id":"https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html#primaryimage"},"thumbnailUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2026\/07\/3-a05-airside-aerial-west-without-copyright-r4-scaled.jpg","datePublished":"2026-07-06T17:09:13+00:00","author":{"@id":"https:\/\/arqa.com\/#\/schema\/person\/1bd66c2185accb93bf4a1eab26833867"},"description":"To meet the exploding demand for travel through Central Oregon\u2019s primary airport, a $180M terminal expansion is underway to double capacity at Redmond Municipal Airport.","breadcrumb":{"@id":"https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html#primaryimage","url":"https:\/\/arqa.com\/wp-content\/uploads\/2026\/07\/3-a05-airside-aerial-west-without-copyright-r4-scaled.jpg","contentUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2026\/07\/3-a05-airside-aerial-west-without-copyright-r4-scaled.jpg","width":2560,"height":1440,"caption":"Redmond Airport Terminal Expansion"},{"@type":"BreadcrumbList","@id":"https:\/\/arqa.com\/en\/architecture\/redmond-airport-terminal-expansion.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Architecture","item":"https:\/\/arqa.com\/en\/architecture"},{"@type":"ListItem","position":2,"name":"Redmond Airport Terminal Expansion"}]},{"@type":"WebSite","@id":"https:\/\/arqa.com\/#website","url":"https:\/\/arqa.com\/","name":"ARQA","description":"Comunidad de Arquitectura y Dise\u00f1o","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/arqa.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/arqa.com\/#\/schema\/person\/1bd66c2185accb93bf4a1eab26833867","name":"Skydan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"\/\/www.gravatar.com\/avatar\/03b4a711f0a5cbc62f753143a2fa7e0c?s=96&#038;r=g&#038;d=http%3A%2F%2Farqa.com%2Fwp-content%2Fuploads%2F2015%2F06%2Fnew-mistery.png","url":"\/\/www.gravatar.com\/avatar\/03b4a711f0a5cbc62f753143a2fa7e0c?s=96&#038;r=g&#038;d=http%3A%2F%2Farqa.com%2Fwp-content%2Fuploads%2F2015%2F06%2Fnew-mistery.png","contentUrl":"\/\/www.gravatar.com\/avatar\/03b4a711f0a5cbc62f753143a2fa7e0c?s=96&#038;r=g&#038;d=http%3A%2F%2Farqa.com%2Fwp-content%2Fuploads%2F2015%2F06%2Fnew-mistery.png","caption":"Skydan"},"sameAs":["https:\/\/www.instagram.com\/skydan_arg\/?hl=es","Skydan"]}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts\/755436","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/users\/122769"}],"replies":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/comments?post=755436"}],"version-history":[{"count":2,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts\/755436\/revisions"}],"predecessor-version":[{"id":755442,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts\/755436\/revisions\/755442"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/media\/755440"}],"wp:attachment":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/media?parent=755436"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/categories?post=755436"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/tags?post=755436"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}