


{"id":578549,"date":"2020-01-07T11:46:08","date_gmt":"2020-01-07T14:46:08","guid":{"rendered":"https:\/\/arqa.com\/?p=578549"},"modified":"2020-01-07T11:53:11","modified_gmt":"2020-01-07T14:53:11","slug":"elbbrucken-railway-stations","status":"publish","type":"post","link":"https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html","title":{"rendered":"Elbbr\u00fccken Railway Stations"},"content":{"rendered":"<p>With the opening of this stop, the Elbbr\u00fccken Underground and S-Bahn station has been completed and passengers can now change directly from the S-Bahn to the Underground system at this new public local transport interchange. Commuters will now have the opportunity to change trains here on their way to Hamburg city center, which will take some of the pressure off the main railway station. Like the Underground station that has already been completed, the roof of the S-Bahn station and the connecting Skywalk were designed by architects von Gerkan, Marg and Partners (gmp) in cooperation with the structural engineers schlaich bergermann partner (sbp).<\/p>\n<p>HafenCity is the most important urban development project of the growing Hamburg metropolitan region. When completed, the Elbbr\u00fccken precinct, which is currently being designed and built, will \u2013 with its urban Elbbr\u00fccken center \u2013 eventually form the eastern end of HafenCity. This is also the location of a congress hotel with a 19-story hotel tower designed by gmp. In order to connect the new urban precinct to the local public transport system, the U4 Underground line has been extended to the\u00a0 Elbbr\u00fccken bridges and a new stop has been completed on the S3\/S31 S-Bahn line. The resulting Underground and S-Bahn station provides an attractive interchange opportunity, particularly for city-center-bound commuters who live to the south of the Elbe River, which will take a significant load off the main railway station during rush-hours.<\/p>\n<p>The Underground station and the design of the roof of the S-Bahn station display the same architectural signature, which means that the transport building and the Elbbr\u00fccken development appear as one entity. The design for the three-dimensional geometry of the steel and glass structure was submitted by the architects von Gerkan, Marg and Partners (gmp) together with structural engineers schlaich bergermann partner (sbp) as part of a competition for the Underground station, with the intention of creating a modern reflection of the imposing historic Elbbr\u00fccken bridges, which are listed as a historic monument. The special position of the Underground station \u2013 the line emerges from underground only just before the station and then runs at high level in parallel to the Elbbr\u00fccken bridges \u2013 creates different levels for the ticket hall, the platform, and the bridges crossing the tracks, which are accessed via steps, escalators, and elevators.<\/p>\n<p>The top steel bridge provides access to the Skywalk that connects the Underground station with the S-Bahn station. This 70-meter-long pedestrian bridge provides a barrier-free crossing over Versmannstrasse and the long-distance railway tracks.<br \/>\nIn this design, architecture and structural engineering are closely interconnected; the synthesis of these two disciplines is mandatory for the optimal development of such a project. The roof structure of the Underground station and the S-Bahn station creates an ellipsoidal arch profile consisting of crossing arched steel frames. The twisted steel beams are arranged to form a diamond-shaped grid pattern, in which the individual arches stabilize each other. Both roofs are based on an eight-meter axial grid. The structural steel members are outside the envelope \u2013 the glazing being supported on the inside \u2013 thereby achieving a distinguished presence in the cityscape, creating an aesthetic response to the adjacent Elbbr\u00fccken bridges. In line with the<br \/>\ndiamond pattern, the roof ends at both gable sides are shaped in the form of conspicuous projecting points.<\/p>\n<p>Analogous to the glass hall of the Underground station, the envelope of the Skywalk also has an ellipsoidal arch cross section that has been constructed using curved safety glass. The glazed envelope provides protection from the weather and offers spectacular views across the roads, tracks, and Elbbr\u00fccken bridges.<\/p>\n<p>[info]<strong>Elbbr\u00fccken Underground Station<\/strong><br \/>\n<strong>Competition<\/strong> 2013: \u2013 1st prize<br \/>\n<strong>Design<\/strong>: Volkwin Marg and J\u00fcrgen Hillmer with Stephanie Joebsch<br \/>\n<strong>Competition Lead<\/strong>: Stephanie Joebsch<br \/>\n<strong>Competition Team<\/strong>: Bernd Kottsieper, Achim Wangler, Peter Radomski<br \/>\n<strong>Construction Documents Lead<\/strong>: Stephanie Joebsch<br \/>\n<strong>Deputy Construction Documents Lead<\/strong>: Bernd Kottsieper<br \/>\n<strong>Construction Documents Team<\/strong>: Hendrik Winter, Renata Dipper, Bendix Fulda, Nicola Jeppel<br \/>\n<strong>Construction Management<\/strong>: Torsten Hinz, Raimund Kinski, Christian Kleiner, Andreas Schulz<br \/>\n<strong>Structural Engineering<\/strong>: schlaich bergermann partner (sbp)<br \/>\n<strong>Lighting Design<\/strong>: Conceptlicht<br \/>\n<strong>Height Access Technology<\/strong>: taw weisse<br \/>\n<strong>Client<\/strong>: Hamburger Hochbahn AG<br \/>\n<strong>Construction Period<\/strong>: 2016 \u2013 2018<br \/>\n<strong>GFA<\/strong>: 3,750 m\u00b2<br \/>\n<strong>Length\/Width\/Height of Roof<\/strong>: 136 m \/ 32 m \/ 16.25 m<br \/>\n<strong>Roof Area<\/strong>: 5,985 m\u00b2<br \/>\n<strong>Link Building Between Elbbr\u00fccken Underground and S-Bahn Stations: Skywalk<\/strong><br \/>\n<strong>Commission<\/strong>: 2014<br \/>\n<strong>Design<\/strong>: Volkwin Marg and J\u00fcrgen Hillmer with Stephanie Joebsch<br \/>\n<strong>Competition Lead<\/strong>: Stephanie Joebsch<br \/>\n<strong>Competition Team<\/strong>: Achim Wangler, Johann von Bothmer<br \/>\n<strong>Construction Documents Lead<\/strong>: Stephanie Joebsch<br \/>\n<strong>Construction Documents Team<\/strong>: Bernd Kottsieper, Bendix Fulda, Nicola Jeppel, Radmila Blagovcanin<br \/>\n<strong>Construction Management<\/strong>: Klaus Hoyer, Raimund Kinski, Katja Poschmann<br \/>\n<strong>Structural Engineering<\/strong>: schlaich bergermann partner (sbp)<br \/>\n<strong>Lighting Design<\/strong>: Conceptlicht<br \/>\n<strong>Vertical Access Technology<\/strong>: taw weisse<br \/>\n<strong>Client<\/strong>: Hamburger Hochbahn AG<br \/>\n<strong>Construction Period<\/strong>: 2017\u20132018<br \/>\n<strong>Length\/Width\/Height<\/strong>: 70 m \/ 5 m \/ 4 m<br \/>\n<strong>Roof Area<\/strong>: 663 m\u00b2<br \/>\n<strong>Roof of Elbbr\u00fccken S-Bahn Station<\/strong><br \/>\n<strong>Commission<\/strong>: 2015<br \/>\n<strong>Design<\/strong>: Volkwin Marg and J\u00fcrgen Hillmer with Stephanie Joebsch<br \/>\n<strong>Competition Lead<\/strong>: Stephanie Joebsch<br \/>\n<strong>Competition Team<\/strong>: Achim Wangler, Johann von Bothmer<br \/>\n<strong>Construction Documents Lead<\/strong>: Stephanie Joebsch<br \/>\n<strong>Construction Documents Team<\/strong>: Bernd Kottsieper, Karl-Heinz Behrendt, Angela Schmidtutz, Lena Wegener, Bendix Fulda, Nicola Jeppel, Radmila Blagovcanin<br \/>\n<strong>Construction Management<\/strong>: Klaus Hoyer, Raimund Kinski, Katja Poschmann<br \/>\n<strong>Structural Engineering<\/strong>: schlaich bergermann partner (sbp)<br \/>\n<strong>Vertical Access Technology<\/strong>: taw weisse<br \/>\n<strong>Client<\/strong>: DB-Station &amp; Service<br \/>\n<strong>Construction Period<\/strong>: 2018 \u2013.2019<br \/>\n<strong>Length\/Width\/Height of Roof<\/strong>: 88 m \/ 26 m \/ 15 m<br \/>\n<strong>Roof Area<\/strong>: 3,019 m\u00b2<br \/>\n<strong>Drawings<\/strong>: \u00a9 schlaich bergermann partner sbp, \u00a9 gmp Architekten<br \/>\n<strong>Photos<\/strong>: \u00a9 Marcus Bredt[\/info]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In time for the timetable change on December 15, 2019, trains stopped for the first time at the new Elbbr\u00fccken metropolitan railway (S-Bahn) station.<\/p>\n","protected":false},"author":122769,"featured_media":578554,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1004332],"tags":[],"class_list":["post-578549","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-architecture","tipologias-urban-infrastructure","paises-alemania-en-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Elbbr\u00fccken Railway Stations &#8211; ARQA<\/title>\n<meta name=\"description\" content=\"In time for the timetable change on December 15, 2019, trains stopped for the first time at the new Elbbr\u00fccken metropolitan railway (S-Bahn) station.\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:locale\" content=\"en_US\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:type\" content=\"article\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:title\" content=\"Elbbr\u00fccken Railway Stations &#8211; ARQA\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:description\" content=\"In time for the timetable change on December 15, 2019, trains stopped for the first time at the new Elbbr\u00fccken metropolitan railway (S-Bahn) station.\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:url\" content=\"https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:site_name\" content=\"ARQA\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/arqa.arquitectura\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:published_time\" content=\"2020-01-07T14:46:08+00:00\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:modified_time\" content=\"2020-01-07T14:53:11+00:00\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:image\" content=\"https:\/\/arqa.com\/wp-content\/uploads\/2020\/01\/2837_3063_3064_191210_mb179_0243_a3.jpg\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"author\" content=\"Skydan\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:creator\" content=\"@arqa_com\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:site\" content=\"@arqa_com\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:data1\" content=\"Skydan\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" class=\"yoast-seo-meta-tag\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/elbbrucken-railway-stations.html#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/elbbrucken-railway-stations.html\"},\"author\":{\"name\":\"Skydan\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/1bd66c2185accb93bf4a1eab26833867\"},\"headline\":\"Elbbr\u00fccken Railway Stations\",\"datePublished\":\"2020-01-07T14:46:08+00:00\",\"dateModified\":\"2020-01-07T14:53:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/elbbrucken-railway-stations.html\"},\"wordCount\":881,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/elbbrucken-railway-stations.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/2837_3063_3064_191210_mb179_0243_a3.jpg\",\"articleSection\":[\"Architecture\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/elbbrucken-railway-stations.html#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/elbbrucken-railway-stations.html\",\"url\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/elbbrucken-railway-stations.html\",\"name\":\"Elbbr\u00fccken Railway Stations &#8211; ARQA\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/elbbrucken-railway-stations.html#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/elbbrucken-railway-stations.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/2837_3063_3064_191210_mb179_0243_a3.jpg\",\"datePublished\":\"2020-01-07T14:46:08+00:00\",\"dateModified\":\"2020-01-07T14:53:11+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/1bd66c2185accb93bf4a1eab26833867\"},\"description\":\"In time for the timetable change on December 15, 2019, trains stopped for the first time at the new Elbbr\u00fccken metropolitan railway (S-Bahn) station.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/elbbrucken-railway-stations.html#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/elbbrucken-railway-stations.html\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/elbbrucken-railway-stations.html#primaryimage\",\"url\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/2837_3063_3064_191210_mb179_0243_a3.jpg\",\"contentUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/2837_3063_3064_191210_mb179_0243_a3.jpg\",\"width\":1200,\"height\":800,\"caption\":\"Elbbr\u00fccken Railway Stations\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/elbbrucken-railway-stations.html#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Architecture\",\"item\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Elbbr\u00fccken Railway Stations\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#website\",\"url\":\"https:\\\/\\\/arqa.com\\\/\",\"name\":\"ARQA\",\"description\":\"Comunidad de Arquitectura y Dise\u00f1o\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/arqa.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/1bd66c2185accb93bf4a1eab26833867\",\"name\":\"Skydan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"\\\/\\\/www.gravatar.com\\\/avatar\\\/03b4a711f0a5cbc62f753143a2fa7e0c?s=96&#038;r=g&#038;d=http%3A%2F%2Farqa.com%2Fwp-content%2Fuploads%2F2015%2F06%2Fnew-mistery.png\",\"url\":\"\\\/\\\/www.gravatar.com\\\/avatar\\\/03b4a711f0a5cbc62f753143a2fa7e0c?s=96&#038;r=g&#038;d=http%3A%2F%2Farqa.com%2Fwp-content%2Fuploads%2F2015%2F06%2Fnew-mistery.png\",\"contentUrl\":\"\\\/\\\/www.gravatar.com\\\/avatar\\\/03b4a711f0a5cbc62f753143a2fa7e0c?s=96&#038;r=g&#038;d=http%3A%2F%2Farqa.com%2Fwp-content%2Fuploads%2F2015%2F06%2Fnew-mistery.png\",\"caption\":\"Skydan\"},\"sameAs\":[\"https:\\\/\\\/www.instagram.com\\\/skydan_arg\\\/?hl=es\",\"Skydan\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Elbbr\u00fccken Railway Stations &#8211; ARQA","description":"In time for the timetable change on December 15, 2019, trains stopped for the first time at the new Elbbr\u00fccken metropolitan railway (S-Bahn) station.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html","og_locale":"en_US","og_type":"article","og_title":"Elbbr\u00fccken Railway Stations &#8211; ARQA","og_description":"In time for the timetable change on December 15, 2019, trains stopped for the first time at the new Elbbr\u00fccken metropolitan railway (S-Bahn) station.","og_url":"https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html","og_site_name":"ARQA","article_publisher":"https:\/\/www.facebook.com\/arqa.arquitectura","article_published_time":"2020-01-07T14:46:08+00:00","article_modified_time":"2020-01-07T14:53:11+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/arqa.com\/wp-content\/uploads\/2020\/01\/2837_3063_3064_191210_mb179_0243_a3.jpg","type":"image\/jpeg"}],"author":"Skydan","twitter_card":"summary_large_image","twitter_creator":"@arqa_com","twitter_site":"@arqa_com","twitter_misc":{"Written by":"Skydan","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html#article","isPartOf":{"@id":"https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html"},"author":{"name":"Skydan","@id":"https:\/\/arqa.com\/#\/schema\/person\/1bd66c2185accb93bf4a1eab26833867"},"headline":"Elbbr\u00fccken Railway Stations","datePublished":"2020-01-07T14:46:08+00:00","dateModified":"2020-01-07T14:53:11+00:00","mainEntityOfPage":{"@id":"https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html"},"wordCount":881,"commentCount":0,"image":{"@id":"https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html#primaryimage"},"thumbnailUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2020\/01\/2837_3063_3064_191210_mb179_0243_a3.jpg","articleSection":["Architecture"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html","url":"https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html","name":"Elbbr\u00fccken Railway Stations &#8211; ARQA","isPartOf":{"@id":"https:\/\/arqa.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html#primaryimage"},"image":{"@id":"https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html#primaryimage"},"thumbnailUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2020\/01\/2837_3063_3064_191210_mb179_0243_a3.jpg","datePublished":"2020-01-07T14:46:08+00:00","dateModified":"2020-01-07T14:53:11+00:00","author":{"@id":"https:\/\/arqa.com\/#\/schema\/person\/1bd66c2185accb93bf4a1eab26833867"},"description":"In time for the timetable change on December 15, 2019, trains stopped for the first time at the new Elbbr\u00fccken metropolitan railway (S-Bahn) station.","breadcrumb":{"@id":"https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html#primaryimage","url":"https:\/\/arqa.com\/wp-content\/uploads\/2020\/01\/2837_3063_3064_191210_mb179_0243_a3.jpg","contentUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2020\/01\/2837_3063_3064_191210_mb179_0243_a3.jpg","width":1200,"height":800,"caption":"Elbbr\u00fccken Railway Stations"},{"@type":"BreadcrumbList","@id":"https:\/\/arqa.com\/en\/architecture\/elbbrucken-railway-stations.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Architecture","item":"https:\/\/arqa.com\/en\/architecture"},{"@type":"ListItem","position":2,"name":"Elbbr\u00fccken Railway Stations"}]},{"@type":"WebSite","@id":"https:\/\/arqa.com\/#website","url":"https:\/\/arqa.com\/","name":"ARQA","description":"Comunidad de Arquitectura y Dise\u00f1o","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/arqa.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/arqa.com\/#\/schema\/person\/1bd66c2185accb93bf4a1eab26833867","name":"Skydan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"\/\/www.gravatar.com\/avatar\/03b4a711f0a5cbc62f753143a2fa7e0c?s=96&#038;r=g&#038;d=http%3A%2F%2Farqa.com%2Fwp-content%2Fuploads%2F2015%2F06%2Fnew-mistery.png","url":"\/\/www.gravatar.com\/avatar\/03b4a711f0a5cbc62f753143a2fa7e0c?s=96&#038;r=g&#038;d=http%3A%2F%2Farqa.com%2Fwp-content%2Fuploads%2F2015%2F06%2Fnew-mistery.png","contentUrl":"\/\/www.gravatar.com\/avatar\/03b4a711f0a5cbc62f753143a2fa7e0c?s=96&#038;r=g&#038;d=http%3A%2F%2Farqa.com%2Fwp-content%2Fuploads%2F2015%2F06%2Fnew-mistery.png","caption":"Skydan"},"sameAs":["https:\/\/www.instagram.com\/skydan_arg\/?hl=es","Skydan"]}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts\/578549","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/users\/122769"}],"replies":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/comments?post=578549"}],"version-history":[{"count":0,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts\/578549\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/media\/578554"}],"wp:attachment":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/media?parent=578549"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/categories?post=578549"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/tags?post=578549"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}