


{"id":473115,"date":"2016-01-29T09:34:18","date_gmt":"2016-01-29T12:34:18","guid":{"rendered":"http:\/\/arqa.com\/?p=473115"},"modified":"2016-01-29T10:02:01","modified_gmt":"2016-01-29T13:02:01","slug":"the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development","status":"publish","type":"post","link":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html","title":{"rendered":"The future of train travel revealed as Arnhem Central Station opens after 20-year development"},"content":{"rendered":"<p>Backed by the Dutch government, this transfer hub rewrites the rulebook on train\u00a0stations and is the most complex of its type in Europe. The station will become the new\u00a0\u2018front door\u2019 of the city, embracing the spirit of travel, and is expected to establish\u00a0Arnhem as an important node between Germany, the Netherlands and Belgium. The\u00a0new terminal houses commercial areas, and a conference centre and provides links to\u00a0the nearby office plaza, city centre, underground parking garage and the Park\u00a0Sonsbeek. The area around the station will become a place in of itself, with 160,000m2\u00a0of offices, shops and a cinema complex.<\/p>\n<p>The 21,750m2 Transfer Terminal features a dramatic twisting structural roof geometry,\u00a0which enables column-free spans of up to 60m in the transfer hall. Taking references\u00a0from the continuous inside\/outside surface of a Klein Bottle, UNStudio aimed to blur\u00a0distinctions between the inside and outside of the terminal by continuing the urban\u00a0landscape into the interior of the transfer hall, where ceilings, walls and floors all\u00a0seamlessly transition into one another. The structure of the roof and twisting column\u00a0was only made possible by abandoning traditional construction methods and materials;\u00a0much lighter steel replaced concrete \u2013 originally intended for the station \u2013 and was\u00a0constructed using boat building techniques on a scale never before attempted.<\/p>\n<p>Delivery of such a complex and lengthy project on time, on budget and without design\u00a0compromise required the courage and determination of both the client, ProRail B.V.\u00a0and the architects. It is also the result of an exceptional collaborative endeavour by the\u00a0key stakeholders, ProRail, Contractor Combination Ballast Nedam \u2013 BAM, the Ministry\u00a0of Infrastructure and the Arnhem City Council.<\/p>\n<p>UNStudio began the masterplan in 1996 and completed its first sketch design for the\u00a0Transfer Terminal back in 2000. After intensively researching passenger flows and\u00a0transportation modes, UNStudio proposed that the new terminal should expand to\u00a0become a \u2018transfer machine\u2019 that incorporates the whole spectrum of public transport,\u00a0meeting the travel demands of the 21st century. Working with structural engineers Arup,\u00a0a space without columns was produced, forming an architectural expression designed\u00a0around the ways people will intuitively use the space. The station works on international,\u00a0national and regional levels, allowing passengers to move between cities intuitively and\u00a0with ease. This project is part of a countrywide railway upgrade that will see new\u00a0stations in Rotterdam, Delft, The Hague, Breda and Utrecht.<\/p>\n<p>\u201c<em>Arnhem Central is no longer just a train station. It has become a transfer hub. We\u00a0wanted to give a new and vital impetus to station design, so rather than merely\u00a0designing the station around the activities and people flows that already took place\u00a0there, the expanded architecture of the new Transfer Terminal directs and determines\u00a0how people use and move around the building<\/em>\u201d said Ben van Berkel, founder and\u00a0principal architect of UNStudio.<\/p>\n<p>\u201cTo keep all stakeholders on board and on the right track during the long journey to\u00a0completion was a real challenge\u201d said Karin van Helmond, Project Manager Station\u00a0Development at ProRail. \u201c<em>In the past twenty years many things changed in the\u00a0economy, technology, politics and social environment. By focusing on our ultimate goal,\u00a0the actual building of this magnificent station, we succeeded in overcoming all setbacks\u00a0and risks and by working closely together we got this unprecedented job done<\/em>\u201d.<\/p>\n<p>Integrating the naturally sloping landscape distinctive to Arnhem, UNStudio conceived\u00a0the Transfer Terminal as a flowing, utilitarian landscape of different functions stacked up\u00a0to four storeys above ground and two below. The key space is the 5,355m2 main\u00a0Transfer Hall, topped with a dynamic, undulating roof form.<\/p>\n<p>In the development of the design, the practice used a series of conceptual structural\u00a0tools to mold the geometry of the terminal landscape to accommodate the different\u00a0programme functions. These include the use of \u2018V-walls\u2019, a load-bearing concrete\u00a0structure that absorbs the differences in the required grids and provides daylight to the\u00a0below ground levels. The spaces between these elements also form the public access\u00a0from the underground car park to the other components.<\/p>\n<p>In 2001, Arnhem Central acquired the status from the Dutch Government as of one of\u00a0the \u2018New Key Projects\u2019 (station areas of national importance). These stations should\u00a0function as catalysts for urban renewal and economic growth. It is anticipated that the\u00a0new Transfer Terminal, which replaces a 1950s train station, will facilitate economic\u00a0growth by enabling a vastly increased daily passenger flow to the city of 110,000\u00a0commuters per day in 2020.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The new \u20ac37.5m (\u00a327.6m) Transfer Terminal at Arnhem Central Station in the\u00a0Netherlands has now completed.\u00a0The station is the result of an ambitious 20-year project \u2013 masterplanned by UNStudio \u2013\u00a0to redevelop the wider station area; the largest post-war development in Arnhem.<\/p>\n","protected":false},"author":109044,"featured_media":473126,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1003683,1004332],"tags":[],"class_list":["post-473115","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-_arqanews-archivo-en","category-architecture","tipologias-urban-infrastructure","paises-holanda-en-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The future of train travel revealed as Arnhem Central Station opens after 20-year development &#8211; ARQA<\/title>\n<meta name=\"description\" content=\"The new \u20ac37.5m (\u00a327.6m) Transfer Terminal at Arnhem Central Station in the\u00a0Netherlands has now completed.\u00a0The station is the result of an ambitious 20-year project \u2013 masterplanned by UNStudio \u2013\u00a0to redevelop the wider station area; the largest post-war development in Arnhem.\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:locale\" content=\"en_US\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:type\" content=\"article\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:title\" content=\"The future of train travel revealed as Arnhem Central Station opens after 20-year development &#8211; ARQA\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:description\" content=\"The new \u20ac37.5m (\u00a327.6m) Transfer Terminal at Arnhem Central Station in the\u00a0Netherlands has now completed.\u00a0The station is the result of an ambitious 20-year project \u2013 masterplanned by UNStudio \u2013\u00a0to redevelop the wider station area; the largest post-war development in Arnhem.\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:url\" content=\"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:site_name\" content=\"ARQA\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/arqa.arquitectura\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:author\" content=\"http:\/\/www.facebook.com\/comunidadarqa\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:published_time\" content=\"2016-01-29T12:34:18+00:00\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:modified_time\" content=\"2016-01-29T13:02:01+00:00\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:image\" content=\"https:\/\/arqa.com\/wp-content\/uploads\/2016\/01\/un-studio_arnhem-station_\u252c\u00aehuftoncrow_014.jpg\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:height\" content=\"969\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"author\" content=\"Carolina Russo\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:creator\" content=\"@arqa_com\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:site\" content=\"@arqa_com\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:data1\" content=\"Carolina Russo\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" class=\"yoast-seo-meta-tag\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html\"},\"author\":{\"name\":\"Carolina Russo\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/f809643de7231de9d89e995e120f6312\"},\"headline\":\"The future of train travel revealed as Arnhem Central Station opens after 20-year development\",\"datePublished\":\"2016-01-29T12:34:18+00:00\",\"dateModified\":\"2016-01-29T13:02:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html\"},\"wordCount\":754,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2016\\\/01\\\/un-studio_arnhem-station_\u252c\u00aehuftoncrow_014.jpg\",\"articleSection\":[\"_Arqa\\\/News-Archivo\",\"Architecture\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html\",\"url\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html\",\"name\":\"The future of train travel revealed as Arnhem Central Station opens after 20-year development &#8211; ARQA\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2016\\\/01\\\/un-studio_arnhem-station_\u252c\u00aehuftoncrow_014.jpg\",\"datePublished\":\"2016-01-29T12:34:18+00:00\",\"dateModified\":\"2016-01-29T13:02:01+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/f809643de7231de9d89e995e120f6312\"},\"description\":\"The new \u20ac37.5m (\u00a327.6m) Transfer Terminal at Arnhem Central Station in the\u00a0Netherlands has now completed.\u00a0The station is the result of an ambitious 20-year project \u2013 masterplanned by UNStudio \u2013\u00a0to redevelop the wider station area; the largest post-war development in Arnhem.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html#primaryimage\",\"url\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2016\\\/01\\\/un-studio_arnhem-station_\u252c\u00aehuftoncrow_014.jpg\",\"contentUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2016\\\/01\\\/un-studio_arnhem-station_\u252c\u00aehuftoncrow_014.jpg\",\"width\":1200,\"height\":969},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"_Arqa\\\/News-Archivo\",\"item\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The future of train travel revealed as Arnhem Central Station opens after 20-year development\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#website\",\"url\":\"https:\\\/\\\/arqa.com\\\/\",\"name\":\"ARQA\",\"description\":\"Comunidad de Arquitectura y Dise\u00f1o\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/arqa.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/f809643de7231de9d89e995e120f6312\",\"name\":\"Carolina Russo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/avatars\\\/109044\\\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg\",\"url\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/avatars\\\/109044\\\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg\",\"contentUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/avatars\\\/109044\\\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg\",\"caption\":\"Carolina Russo\"},\"description\":\"Editora de Contenidos ARQA\",\"sameAs\":[\"http:\\\/\\\/www.facebook.com\\\/comunidadarqa\",\"https:\\\/\\\/x.com\\\/arqa_com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The future of train travel revealed as Arnhem Central Station opens after 20-year development &#8211; ARQA","description":"The new \u20ac37.5m (\u00a327.6m) Transfer Terminal at Arnhem Central Station in the\u00a0Netherlands has now completed.\u00a0The station is the result of an ambitious 20-year project \u2013 masterplanned by UNStudio \u2013\u00a0to redevelop the wider station area; the largest post-war development in Arnhem.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html","og_locale":"en_US","og_type":"article","og_title":"The future of train travel revealed as Arnhem Central Station opens after 20-year development &#8211; ARQA","og_description":"The new \u20ac37.5m (\u00a327.6m) Transfer Terminal at Arnhem Central Station in the\u00a0Netherlands has now completed.\u00a0The station is the result of an ambitious 20-year project \u2013 masterplanned by UNStudio \u2013\u00a0to redevelop the wider station area; the largest post-war development in Arnhem.","og_url":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html","og_site_name":"ARQA","article_publisher":"https:\/\/www.facebook.com\/arqa.arquitectura","article_author":"http:\/\/www.facebook.com\/comunidadarqa","article_published_time":"2016-01-29T12:34:18+00:00","article_modified_time":"2016-01-29T13:02:01+00:00","og_image":[{"width":1200,"height":969,"url":"https:\/\/arqa.com\/wp-content\/uploads\/2016\/01\/un-studio_arnhem-station_\u252c\u00aehuftoncrow_014.jpg","type":"image\/jpeg"}],"author":"Carolina Russo","twitter_card":"summary_large_image","twitter_creator":"@arqa_com","twitter_site":"@arqa_com","twitter_misc":{"Written by":"Carolina Russo","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html#article","isPartOf":{"@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html"},"author":{"name":"Carolina Russo","@id":"https:\/\/arqa.com\/#\/schema\/person\/f809643de7231de9d89e995e120f6312"},"headline":"The future of train travel revealed as Arnhem Central Station opens after 20-year development","datePublished":"2016-01-29T12:34:18+00:00","dateModified":"2016-01-29T13:02:01+00:00","mainEntityOfPage":{"@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html"},"wordCount":754,"commentCount":0,"image":{"@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html#primaryimage"},"thumbnailUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2016\/01\/un-studio_arnhem-station_\u252c\u00aehuftoncrow_014.jpg","articleSection":["_Arqa\/News-Archivo","Architecture"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html","url":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html","name":"The future of train travel revealed as Arnhem Central Station opens after 20-year development &#8211; ARQA","isPartOf":{"@id":"https:\/\/arqa.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html#primaryimage"},"image":{"@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html#primaryimage"},"thumbnailUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2016\/01\/un-studio_arnhem-station_\u252c\u00aehuftoncrow_014.jpg","datePublished":"2016-01-29T12:34:18+00:00","dateModified":"2016-01-29T13:02:01+00:00","author":{"@id":"https:\/\/arqa.com\/#\/schema\/person\/f809643de7231de9d89e995e120f6312"},"description":"The new \u20ac37.5m (\u00a327.6m) Transfer Terminal at Arnhem Central Station in the\u00a0Netherlands has now completed.\u00a0The station is the result of an ambitious 20-year project \u2013 masterplanned by UNStudio \u2013\u00a0to redevelop the wider station area; the largest post-war development in Arnhem.","breadcrumb":{"@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html#primaryimage","url":"https:\/\/arqa.com\/wp-content\/uploads\/2016\/01\/un-studio_arnhem-station_\u252c\u00aehuftoncrow_014.jpg","contentUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2016\/01\/un-studio_arnhem-station_\u252c\u00aehuftoncrow_014.jpg","width":1200,"height":969},{"@type":"BreadcrumbList","@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/the-future-of-train-travel-revealed-as-arnhem-central-station-opens-after-20-year-development.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"_Arqa\/News-Archivo","item":"https:\/\/arqa.com\/en\/_arqanews-archivo-en"},{"@type":"ListItem","position":2,"name":"The future of train travel revealed as Arnhem Central Station opens after 20-year development"}]},{"@type":"WebSite","@id":"https:\/\/arqa.com\/#website","url":"https:\/\/arqa.com\/","name":"ARQA","description":"Comunidad de Arquitectura y Dise\u00f1o","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/arqa.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/arqa.com\/#\/schema\/person\/f809643de7231de9d89e995e120f6312","name":"Carolina Russo","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arqa.com\/wp-content\/uploads\/sites\/3\/avatars\/109044\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg","url":"https:\/\/arqa.com\/wp-content\/uploads\/sites\/3\/avatars\/109044\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg","contentUrl":"https:\/\/arqa.com\/wp-content\/uploads\/sites\/3\/avatars\/109044\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg","caption":"Carolina Russo"},"description":"Editora de Contenidos ARQA","sameAs":["http:\/\/www.facebook.com\/comunidadarqa","https:\/\/x.com\/arqa_com"]}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts\/473115","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/users\/109044"}],"replies":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/comments?post=473115"}],"version-history":[{"count":0,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts\/473115\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/media\/473126"}],"wp:attachment":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/media?parent=473115"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/categories?post=473115"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/tags?post=473115"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}