


{"id":424580,"date":"2014-09-12T09:53:07","date_gmt":"2014-09-12T12:53:07","guid":{"rendered":"http:\/\/arqa.com\/architecture\/terminal-de-ski-en-austria-2.html"},"modified":"2014-09-12T09:56:01","modified_gmt":"2014-09-12T12:56:01","slug":"terminal-de-ski-en-austria","status":"publish","type":"post","link":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html","title":{"rendered":"Skiterminal, in Austria"},"content":{"rendered":"<p>[info]<strong>Skiterminal &#8211; Schladming<\/strong><br \/>\n<strong>Architecture:<\/strong> HOFRICHTER-RITTER Architects, Graz, Austria<br \/>\n<strong>Statik:<\/strong> Peter Mandl, Graz, Austria<br \/>\n<strong>Project costs:<\/strong> 22.000.000\u20ac Euro<br \/>\n<strong>Guests per year:<\/strong> approximately 1 mio.<br \/>\n<strong>Proportions:<\/strong> 80 x 40 m<br \/>\n<strong>Cubature:<\/strong> 52,500 m3<br \/>\n<strong>Effective area (station plus garage):<\/strong> 18.500 m2<br \/>\n<strong>Columns:<\/strong> 74 columns carry the Loop. Each column can carry 230 tons.<br \/>\n<strong>Armouring for concrete shell:<\/strong> 850,000 kg<br \/>\n<strong>Glass facade:<\/strong> ca. 1,000 m2<br \/>\n<strong>Investment:<\/strong> \u20ac 22 Mio.[\/info]<\/p>\n<p>In the Southern most part (close to the finishing passage), the new headquarters of the Planai can be found; it hosts all enterprises and subsidiary companies of the Planai-Bahnen (360 employees). In the central building, offices for important partners such as Wintersportverein Schladming, Austrian Ski Federation or FIS are available. The Northern complex with 1,000 m2 of glass facade is accessible for guests.\u00a0Upcoming major sport events had already been taken into consideration. A glass World Championships Studio for TV broadcasts was established, and its quality can easily stand international comparisons or even top international models.<\/p>\n<p><strong>One-Stop-Shop:<\/strong><br \/>\nThe concept of the \u201cOne-Stop-Shop\u201d is new. At this central place, the holiday guests can find EVERYTHING they need for a comfortable and relaxing vacation.<br \/>\nAt the One-Stop-Shop, the guests can get it all done: booking a room, renting skies, buying tickets, booking rafting and hiking guides in summers or going shopping in a sports store with a high-level ski depot. And even the sanitary facilities set new standards; they are more than spick and span.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>An oversized \u201cLoop\u201c (based on the model of a folded piece of paper) coats the whole building and is carried by 74 diagonal columns. Each and every single column can carry 230 tons. Inside the \u201cLoop\u201d, three connected complexes of buildings are situated. <\/p>\n","protected":false},"author":109044,"featured_media":424575,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1003683,1004332],"tags":[],"class_list":["post-424580","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-_arqanews-archivo-en","category-architecture","tipologias-buildings-and-sports-arenas","paises-austria-en-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Skiterminal, in Austria &#8211; ARQA<\/title>\n<meta name=\"description\" content=\"An oversized \u201cLoop\u201c (based on the model of a folded piece of paper) coats the whole building and is carried by 74 diagonal columns. Each and every single column can carry 230 tons. Inside the \u201cLoop\u201d, three connected complexes of buildings are situated.\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:locale\" content=\"en_US\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:type\" content=\"article\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:title\" content=\"Skiterminal, in Austria &#8211; ARQA\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:description\" content=\"An oversized \u201cLoop\u201c (based on the model of a folded piece of paper) coats the whole building and is carried by 74 diagonal columns. Each and every single column can carry 230 tons. Inside the \u201cLoop\u201d, three connected complexes of buildings are situated.\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:url\" content=\"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:site_name\" content=\"ARQA\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/arqa.arquitectura\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:author\" content=\"http:\/\/www.facebook.com\/comunidadarqa\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:published_time\" content=\"2014-09-12T12:53:07+00:00\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:modified_time\" content=\"2014-09-12T12:56:01+00:00\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:image\" content=\"https:\/\/arqa.com\/wp-content\/uploads\/2014\/09\/106.jpg\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:width\" content=\"746\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:height\" content=\"740\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"author\" content=\"Carolina Russo\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:creator\" content=\"@arqa_com\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:site\" content=\"@arqa_com\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:data1\" content=\"Carolina Russo\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" class=\"yoast-seo-meta-tag\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/terminal-de-ski-en-austria.html#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/terminal-de-ski-en-austria.html\"},\"author\":{\"name\":\"Carolina Russo\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/f809643de7231de9d89e995e120f6312\"},\"headline\":\"Skiterminal, in Austria\",\"datePublished\":\"2014-09-12T12:53:07+00:00\",\"dateModified\":\"2014-09-12T12:56:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/terminal-de-ski-en-austria.html\"},\"wordCount\":229,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/terminal-de-ski-en-austria.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2014\\\/09\\\/106.jpg\",\"articleSection\":[\"_Arqa\\\/News-Archivo\",\"Architecture\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/terminal-de-ski-en-austria.html#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/terminal-de-ski-en-austria.html\",\"url\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/terminal-de-ski-en-austria.html\",\"name\":\"Skiterminal, in Austria &#8211; ARQA\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/terminal-de-ski-en-austria.html#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/terminal-de-ski-en-austria.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2014\\\/09\\\/106.jpg\",\"datePublished\":\"2014-09-12T12:53:07+00:00\",\"dateModified\":\"2014-09-12T12:56:01+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/f809643de7231de9d89e995e120f6312\"},\"description\":\"An oversized \u201cLoop\u201c (based on the model of a folded piece of paper) coats the whole building and is carried by 74 diagonal columns. Each and every single column can carry 230 tons. Inside the \u201cLoop\u201d, three connected complexes of buildings are situated.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/terminal-de-ski-en-austria.html#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/terminal-de-ski-en-austria.html\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/terminal-de-ski-en-austria.html#primaryimage\",\"url\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2014\\\/09\\\/106.jpg\",\"contentUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2014\\\/09\\\/106.jpg\",\"width\":746,\"height\":740},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\\\/terminal-de-ski-en-austria.html#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"_Arqa\\\/News-Archivo\",\"item\":\"https:\\\/\\\/arqa.com\\\/en\\\/_arqanews-archivo-en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Skiterminal, in Austria\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#website\",\"url\":\"https:\\\/\\\/arqa.com\\\/\",\"name\":\"ARQA\",\"description\":\"Comunidad de Arquitectura y Dise\u00f1o\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/arqa.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/f809643de7231de9d89e995e120f6312\",\"name\":\"Carolina Russo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/avatars\\\/109044\\\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg\",\"url\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/avatars\\\/109044\\\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg\",\"contentUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/avatars\\\/109044\\\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg\",\"caption\":\"Carolina Russo\"},\"description\":\"Editora de Contenidos ARQA\",\"sameAs\":[\"http:\\\/\\\/www.facebook.com\\\/comunidadarqa\",\"https:\\\/\\\/x.com\\\/arqa_com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Skiterminal, in Austria &#8211; ARQA","description":"An oversized \u201cLoop\u201c (based on the model of a folded piece of paper) coats the whole building and is carried by 74 diagonal columns. Each and every single column can carry 230 tons. Inside the \u201cLoop\u201d, three connected complexes of buildings are situated.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html","og_locale":"en_US","og_type":"article","og_title":"Skiterminal, in Austria &#8211; ARQA","og_description":"An oversized \u201cLoop\u201c (based on the model of a folded piece of paper) coats the whole building and is carried by 74 diagonal columns. Each and every single column can carry 230 tons. Inside the \u201cLoop\u201d, three connected complexes of buildings are situated.","og_url":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html","og_site_name":"ARQA","article_publisher":"https:\/\/www.facebook.com\/arqa.arquitectura","article_author":"http:\/\/www.facebook.com\/comunidadarqa","article_published_time":"2014-09-12T12:53:07+00:00","article_modified_time":"2014-09-12T12:56:01+00:00","og_image":[{"width":746,"height":740,"url":"https:\/\/arqa.com\/wp-content\/uploads\/2014\/09\/106.jpg","type":"image\/jpeg"}],"author":"Carolina Russo","twitter_card":"summary_large_image","twitter_creator":"@arqa_com","twitter_site":"@arqa_com","twitter_misc":{"Written by":"Carolina Russo","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html#article","isPartOf":{"@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html"},"author":{"name":"Carolina Russo","@id":"https:\/\/arqa.com\/#\/schema\/person\/f809643de7231de9d89e995e120f6312"},"headline":"Skiterminal, in Austria","datePublished":"2014-09-12T12:53:07+00:00","dateModified":"2014-09-12T12:56:01+00:00","mainEntityOfPage":{"@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html"},"wordCount":229,"commentCount":0,"image":{"@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html#primaryimage"},"thumbnailUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2014\/09\/106.jpg","articleSection":["_Arqa\/News-Archivo","Architecture"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html","url":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html","name":"Skiterminal, in Austria &#8211; ARQA","isPartOf":{"@id":"https:\/\/arqa.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html#primaryimage"},"image":{"@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html#primaryimage"},"thumbnailUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2014\/09\/106.jpg","datePublished":"2014-09-12T12:53:07+00:00","dateModified":"2014-09-12T12:56:01+00:00","author":{"@id":"https:\/\/arqa.com\/#\/schema\/person\/f809643de7231de9d89e995e120f6312"},"description":"An oversized \u201cLoop\u201c (based on the model of a folded piece of paper) coats the whole building and is carried by 74 diagonal columns. Each and every single column can carry 230 tons. Inside the \u201cLoop\u201d, three connected complexes of buildings are situated.","breadcrumb":{"@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html#primaryimage","url":"https:\/\/arqa.com\/wp-content\/uploads\/2014\/09\/106.jpg","contentUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2014\/09\/106.jpg","width":746,"height":740},{"@type":"BreadcrumbList","@id":"https:\/\/arqa.com\/en\/_arqanews-archivo-en\/terminal-de-ski-en-austria.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"_Arqa\/News-Archivo","item":"https:\/\/arqa.com\/en\/_arqanews-archivo-en"},{"@type":"ListItem","position":2,"name":"Skiterminal, in Austria"}]},{"@type":"WebSite","@id":"https:\/\/arqa.com\/#website","url":"https:\/\/arqa.com\/","name":"ARQA","description":"Comunidad de Arquitectura y Dise\u00f1o","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/arqa.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/arqa.com\/#\/schema\/person\/f809643de7231de9d89e995e120f6312","name":"Carolina Russo","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arqa.com\/wp-content\/uploads\/sites\/3\/avatars\/109044\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg","url":"https:\/\/arqa.com\/wp-content\/uploads\/sites\/3\/avatars\/109044\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg","contentUrl":"https:\/\/arqa.com\/wp-content\/uploads\/sites\/3\/avatars\/109044\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg","caption":"Carolina Russo"},"description":"Editora de Contenidos ARQA","sameAs":["http:\/\/www.facebook.com\/comunidadarqa","https:\/\/x.com\/arqa_com"]}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts\/424580","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/users\/109044"}],"replies":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/comments?post=424580"}],"version-history":[{"count":0,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts\/424580\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/media\/424575"}],"wp:attachment":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/media?parent=424580"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/categories?post=424580"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/tags?post=424580"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}