


{"id":417674,"date":"2014-05-21T12:43:10","date_gmt":"2014-05-21T15:43:10","guid":{"rendered":"http:\/\/arqa.com\/?p=417674"},"modified":"2014-05-21T12:43:10","modified_gmt":"2014-05-21T15:43:10","slug":"new-construction-rehearsal-building-ballett-rhein-dusseldorf","status":"publish","type":"post","link":"https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html","title":{"rendered":"New construction of rehearsal building for \u201cBallett am Rhein\u201d, D\u00fcsseldorf"},"content":{"rendered":"<p>[info]<strong>New construction of rehearsal building for \u201cBallett am Rhein\u201d, D\u00fcsseldorf<\/strong><br \/>\nPPP scheme gmp \u2219 Architects von Gerkan, Marg and Partners\u00a0in cooperation with HOCHTIEF Solutions AG and HMI, BIG and Capatti Staubach<br \/>\n<strong>Design:<\/strong> Volkwin Marg and Hubert Nienhoff with Kristian Spencker<br \/>\n<strong>Team members:<\/strong> Veit Lieneweg, Silvia Schneider, Michael Scholz, Daniel Tome<br \/>\n<strong>Client:<\/strong> The City of D\u00fcsseldorf<br \/>\n<strong>GFA:<\/strong> 4,500 m\u00b2[\/info]<\/p>\n<p>The new ballet building will be created on the historic site of the former Rheinbahn depot \u201cam Steinberg\u201d in D\u00fcsseldorf, between the listed tramway depot and the back of the housing development at Kopernikusstrasse. The building will provide the Oper\u2019s 50 professional dancers and the ballet school\u2019s 55 students with two ballet rooms with full-size stage dimensions, three smaller practice rooms as well as rest rooms, showers, a physiotherapy room and an apartment for guest artists.\u00a0The new building has been designed as a compact cube and is clearly oriented towards Merowingerstrasse, from where the premises will be accessed in future. The two-storey foyer is located here. Its glazed fa\u00e7ade defines the entrance area and stands out distinctly from the fair-faced concrete surface of the building.<\/p>\n<p>Towards the south, the building recedes in deference to the neighbouring historic Rheinbahn depot, forming a transition to the 12m high stacked ballet rooms to the north. The two-storey foyer and the canteen welcome the visitor with generous access space, from where circulation areas lead through the building on all floors.<br \/>\nThe ballet rehearsal rooms are on the ground and second floors, opposite the changing rooms and other supporting facilities. Access is via spacious lobbies from where the rehearsal rooms are entered on the side opposite the mirror wall, i.e. without disturbing ongoing dance practice.<\/p>\n<p>The clerestory light bands of the north-facing rehearsal rooms admit daylight throughout the year and large, vertical windows open views to the outside. The position of the ballet building deep inside the site provides maximum tranquillity while, at the same time, giving appropriate prominence to the listed rail depot. As a result, there is optimum tension between technology and poetry, between hard physical work and rehearsal performances in the new Ballett am Rhein building.<\/p>\n<p>The architects von Gerkan, Marg und Partners have already designed and completed the State Ballet School in Berlin. The school complex not only provides optimum facilities for contemporary professional stage dance training, but also reflects the uniqueness of the institution in Germany and its international reputation through its dynamic architectural design.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The architects von Gerkan, Marg and Partners (gmp) are designing the new rehearsal building for the ballet company of Deutsche Oper am Rhein. In a consortium with HOCHTIEF Solutions, they were commissioned by D\u00fcsseldorf City Council in a PPP scheme.<\/p>\n","protected":false},"author":109044,"featured_media":417675,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1003683,1003248],"tags":[],"class_list":["post-417674","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-_arqanews-archivo-en","category-projects","tipologias-theatres-and-auditoriums","paises-alemania-en-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>New construction of rehearsal building for \u201cBallett am Rhein\u201d, D\u00fcsseldorf &#8211; ARQA<\/title>\n<meta name=\"description\" content=\"The architects von Gerkan, Marg and Partners (gmp) are designing the new rehearsal building for the ballet company of Deutsche Oper am Rhein. In a consortium with HOCHTIEF Solutions, they were commissioned by D\u00fcsseldorf City Council in a PPP scheme.\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:locale\" content=\"en_US\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:type\" content=\"article\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:title\" content=\"New construction of rehearsal building for \u201cBallett am Rhein\u201d, D\u00fcsseldorf &#8211; ARQA\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:description\" content=\"The architects von Gerkan, Marg and Partners (gmp) are designing the new rehearsal building for the ballet company of Deutsche Oper am Rhein. In a consortium with HOCHTIEF Solutions, they were commissioned by D\u00fcsseldorf City Council in a PPP scheme.\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:url\" content=\"https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:site_name\" content=\"ARQA\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/arqa.arquitectura\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:author\" content=\"http:\/\/www.facebook.com\/comunidadarqa\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:published_time\" content=\"2014-05-21T15:43:10+00:00\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:image\" content=\"https:\/\/arqa.com\/wp-content\/uploads\/2014\/05\/2960_140214-balletthaus_stb_veroeffentlichung.jpg\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:height\" content=\"859\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"author\" content=\"Carolina Russo\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:creator\" content=\"@arqa_com\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:site\" content=\"@arqa_com\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:data1\" content=\"Carolina Russo\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" class=\"yoast-seo-meta-tag\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/projects\\\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/projects\\\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html\"},\"author\":{\"name\":\"Carolina Russo\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/f809643de7231de9d89e995e120f6312\"},\"headline\":\"New construction of rehearsal building for \u201cBallett am Rhein\u201d, D\u00fcsseldorf\",\"datePublished\":\"2014-05-21T15:43:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/projects\\\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html\"},\"wordCount\":421,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/projects\\\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2014\\\/05\\\/2960_140214-balletthaus_stb_veroeffentlichung.jpg\",\"articleSection\":[\"_Arqa\\\/News-Archivo\",\"Projects\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/projects\\\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/projects\\\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html\",\"url\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/projects\\\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html\",\"name\":\"New construction of rehearsal building for \u201cBallett am Rhein\u201d, D\u00fcsseldorf &#8211; ARQA\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/projects\\\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/projects\\\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2014\\\/05\\\/2960_140214-balletthaus_stb_veroeffentlichung.jpg\",\"datePublished\":\"2014-05-21T15:43:10+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/f809643de7231de9d89e995e120f6312\"},\"description\":\"The architects von Gerkan, Marg and Partners (gmp) are designing the new rehearsal building for the ballet company of Deutsche Oper am Rhein. In a consortium with HOCHTIEF Solutions, they were commissioned by D\u00fcsseldorf City Council in a PPP scheme.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/projects\\\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/projects\\\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/projects\\\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html#primaryimage\",\"url\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2014\\\/05\\\/2960_140214-balletthaus_stb_veroeffentlichung.jpg\",\"contentUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2014\\\/05\\\/2960_140214-balletthaus_stb_veroeffentlichung.jpg\",\"width\":1200,\"height\":859},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/projects\\\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Architecture\",\"item\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture\\\/projects\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"New construction of rehearsal building for \u201cBallett am Rhein\u201d, D\u00fcsseldorf\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#website\",\"url\":\"https:\\\/\\\/arqa.com\\\/\",\"name\":\"ARQA\",\"description\":\"Comunidad de Arquitectura y Dise\u00f1o\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/arqa.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/f809643de7231de9d89e995e120f6312\",\"name\":\"Carolina Russo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/avatars\\\/109044\\\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg\",\"url\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/avatars\\\/109044\\\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg\",\"contentUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/avatars\\\/109044\\\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg\",\"caption\":\"Carolina Russo\"},\"description\":\"Editora de Contenidos ARQA\",\"sameAs\":[\"http:\\\/\\\/www.facebook.com\\\/comunidadarqa\",\"https:\\\/\\\/x.com\\\/arqa_com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New construction of rehearsal building for \u201cBallett am Rhein\u201d, D\u00fcsseldorf &#8211; ARQA","description":"The architects von Gerkan, Marg and Partners (gmp) are designing the new rehearsal building for the ballet company of Deutsche Oper am Rhein. In a consortium with HOCHTIEF Solutions, they were commissioned by D\u00fcsseldorf City Council in a PPP scheme.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html","og_locale":"en_US","og_type":"article","og_title":"New construction of rehearsal building for \u201cBallett am Rhein\u201d, D\u00fcsseldorf &#8211; ARQA","og_description":"The architects von Gerkan, Marg and Partners (gmp) are designing the new rehearsal building for the ballet company of Deutsche Oper am Rhein. In a consortium with HOCHTIEF Solutions, they were commissioned by D\u00fcsseldorf City Council in a PPP scheme.","og_url":"https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html","og_site_name":"ARQA","article_publisher":"https:\/\/www.facebook.com\/arqa.arquitectura","article_author":"http:\/\/www.facebook.com\/comunidadarqa","article_published_time":"2014-05-21T15:43:10+00:00","og_image":[{"width":1200,"height":859,"url":"https:\/\/arqa.com\/wp-content\/uploads\/2014\/05\/2960_140214-balletthaus_stb_veroeffentlichung.jpg","type":"image\/jpeg"}],"author":"Carolina Russo","twitter_card":"summary_large_image","twitter_creator":"@arqa_com","twitter_site":"@arqa_com","twitter_misc":{"Written by":"Carolina Russo","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html#article","isPartOf":{"@id":"https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html"},"author":{"name":"Carolina Russo","@id":"https:\/\/arqa.com\/#\/schema\/person\/f809643de7231de9d89e995e120f6312"},"headline":"New construction of rehearsal building for \u201cBallett am Rhein\u201d, D\u00fcsseldorf","datePublished":"2014-05-21T15:43:10+00:00","mainEntityOfPage":{"@id":"https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html"},"wordCount":421,"commentCount":0,"image":{"@id":"https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html#primaryimage"},"thumbnailUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2014\/05\/2960_140214-balletthaus_stb_veroeffentlichung.jpg","articleSection":["_Arqa\/News-Archivo","Projects"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html","url":"https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html","name":"New construction of rehearsal building for \u201cBallett am Rhein\u201d, D\u00fcsseldorf &#8211; ARQA","isPartOf":{"@id":"https:\/\/arqa.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html#primaryimage"},"image":{"@id":"https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html#primaryimage"},"thumbnailUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2014\/05\/2960_140214-balletthaus_stb_veroeffentlichung.jpg","datePublished":"2014-05-21T15:43:10+00:00","author":{"@id":"https:\/\/arqa.com\/#\/schema\/person\/f809643de7231de9d89e995e120f6312"},"description":"The architects von Gerkan, Marg and Partners (gmp) are designing the new rehearsal building for the ballet company of Deutsche Oper am Rhein. In a consortium with HOCHTIEF Solutions, they were commissioned by D\u00fcsseldorf City Council in a PPP scheme.","breadcrumb":{"@id":"https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html#primaryimage","url":"https:\/\/arqa.com\/wp-content\/uploads\/2014\/05\/2960_140214-balletthaus_stb_veroeffentlichung.jpg","contentUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2014\/05\/2960_140214-balletthaus_stb_veroeffentlichung.jpg","width":1200,"height":859},{"@type":"BreadcrumbList","@id":"https:\/\/arqa.com\/en\/architecture\/projects\/new-construction-rehearsal-building-ballett-rhein-dusseldorf.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Architecture","item":"https:\/\/arqa.com\/en\/architecture"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/arqa.com\/en\/architecture\/projects"},{"@type":"ListItem","position":3,"name":"New construction of rehearsal building for \u201cBallett am Rhein\u201d, D\u00fcsseldorf"}]},{"@type":"WebSite","@id":"https:\/\/arqa.com\/#website","url":"https:\/\/arqa.com\/","name":"ARQA","description":"Comunidad de Arquitectura y Dise\u00f1o","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/arqa.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/arqa.com\/#\/schema\/person\/f809643de7231de9d89e995e120f6312","name":"Carolina Russo","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arqa.com\/wp-content\/uploads\/sites\/3\/avatars\/109044\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg","url":"https:\/\/arqa.com\/wp-content\/uploads\/sites\/3\/avatars\/109044\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg","contentUrl":"https:\/\/arqa.com\/wp-content\/uploads\/sites\/3\/avatars\/109044\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg","caption":"Carolina Russo"},"description":"Editora de Contenidos ARQA","sameAs":["http:\/\/www.facebook.com\/comunidadarqa","https:\/\/x.com\/arqa_com"]}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts\/417674","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/users\/109044"}],"replies":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/comments?post=417674"}],"version-history":[{"count":0,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts\/417674\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/media\/417675"}],"wp:attachment":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/media?parent=417674"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/categories?post=417674"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/tags?post=417674"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}