


{"id":413197,"date":"2014-04-09T13:40:14","date_gmt":"2014-04-09T16:40:14","guid":{"rendered":"http:\/\/arqa.com\/?p=413197"},"modified":"2014-04-09T13:40:14","modified_gmt":"2014-04-09T16:40:14","slug":"factory-building-vitra-campus","status":"publish","type":"post","link":"https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html","title":{"rendered":"Factory Building on the Vitra Campus"},"content":{"rendered":"<p><strong>Development of the Vitra Campus<\/strong><br \/>\nAfter 1993 \u2013 the year in which Tadao Ando\u2019s Conference Pavilion and the Fire\u00a0Station by Zaha Hadid were completed, followed by the dedication of \u00c1lvaro Siza\u2019s\u00a0factory hall one year later \u2013 no new buildings were constructed on the Vitra Campus\u00a0in Weil am Rhein for more than a decade. A new expansion phase began in 2006\u00a0with commissions assigned to Herzog &amp; de Meuron and the Japanese architectural\u00a0team SANAA. The Basel-based architects were entrusted with the VitraHaus project\u00a0on a site outside of the actual production compound in the northern corner of the\u00a0Campus. The VitraHaus, which opened in early 2010, serves as a presentation venue\u00a0for the Vitra Home Collection and marks the entrance to the company premises\u00a0together with Frank Gehry\u2019s Vitra Design Museum. SANAA began to plan a\u00a0production facility for Vitrashop \u2013 a shop fitting company within the Vitra Group \u2013\u00a0on the south side of the Campus. The completion of these two new buildings also\u00a0achieved a partial restructuring of the Campus grounds by separating operational\u00a0logistics from public visitor traffic. The central axis leading to the Hadid Fire Station is\u00a0now mainly used by visitors, while deliveries and dispatches are primarily routed\u00a0through the access road that lies on the eastern side of the premises.<\/p>\n<p><strong>The selection of SANAA<\/strong><br \/>\nBy choosing SANAA for this project, Vitra continued a strategy pursued for the\u00a0previous 25 years of commissioning internationally renowned contemporary\u00a0architects with the expansion of the Campus. The architectural firm SANAA (Sejima\u00a0and Nishizawa and Associates), which was founded by Kazuyo Sejima and Ryue\u00a0Nishizawa in Tokyo in 1995, initially established its reputation with residential\u00a0structures and small museum buildings in Japan. In the first decade of the 21st\u00a0century, they completed a number of prominent projects in Europe and North\u00a0<span style=\"line-height: 1.5em;\">America, including the Zollverein School of Management and Design, the Theatre\u00a0<\/span>and Cultural Centre in Almere, the Glass Pavilion at the Toledo Museum of Art, the\u00a0New Museum of Contemporary Art in New York and the Rolex Learning Center at\u00a0EPFL Lausanne. 2012 saw the opening of the Louvre Lens, a Louvre satellite museum\u00a0located near Lille in northern France.<\/p>\n<p>Rolf Fehlbaum, Chairman of Vitra\u2019s board of directors, explains his interest in the\u00a0architectural approach of SANAA and the reasons that led to the selection of the\u00a0Japanese team: though imbued with lightness and precision, their architecture is not\u00a0defined by rigid formalism, laboured originality or moralizing minimalism. Fehlbaum\u00a0recognizes a fundamental characteristic in the \u2018removal of everything that is not\u00a0essential\u2019 \u2013 in other words, a reductiveness that ultimately gives visible form to the\u00a0requirements of the building in its architecture and structure.<\/p>\n<p>One of the qualities of SANAA\u2019s architecture is indeed the analysis of complex\u00a0spatial and functional needs and the aim of developing strictly reductive,\u00a0corresponding plans that break with traditional hierarchies and offer freedom in the\u00a0usage of spaces. One such example is the 21st Century Museum of Contemporary\u00a0Art in Kanazawa (2004), whose galleries of variable sizes, shapes and proportions,\u00a0along with additional functional rooms, are embedded in the circulation space\u00a0defined by the round glazed perimeter walls, providing a variety of options for the\u00a0presentation of exhibitions.<\/p>\n<p><strong>A production facility without a role model<\/strong><br \/>\nAlmost all of the major projects that SANAA has completed up until now have been\u00a0buildings for cultural institutions or universities. In Weil am Rhein \u2013 with the first\u00a0industrial facility to be designed by SANAA \u2013 the idea was to apply a similar\u00a0approach to the construction of a production hall.\u00a0The plan for the new structure was initiated by the desire of Vitra\u2019s management to\u00a0replace an old factory building near the southern corner of the premises that had\u00a0survived the great fire in 1981 with only minor damage. The extant building was not\u00a0only showing its age, but was also too small for current demands. The new facility\u00a0was to provide 20,000 square metres of floor area \u2013 compared to 12,000 square\u00a0metres in the old structure.<\/p>\n<p>The architectural brief presented to SANAA by the company management specified\u00a0a division of the total space into four separate areas that could operate\u00a0independently from one another, but would also provide optimal conditions for\u00a0operations that required use of the entire space. After making a detailed analysis of\u00a0the brief, SANAA suggested that the preliminary decisions be revised, replacing the\u00a0four orthogonal volumes that were correlated to the existing grid of the Campus with\u00a0a single circular building. This proposal, which at first seemed unusual, was based on\u00a0the realization that logistics and production methods no longer adhere to strictly\u00a0hierarchical principles, but require flexibility. This was especially true in the case of\u00a0the future occupants of the new facility, the shop fitting company Vitrashop.<\/p>\n<p>Although Vitrashop primarily utilizes standard components in the interiors that it\u00a0creates for retail and commercial customers, the elements are customized to suit the\u00a0specifications and desires of the individual clients. This contradicts a strictly linear\u00a0flow of goods and fabrication methods. Consequently, the interior of the hall is\u00a0divided into different zones: the northern section provides high rack storage for\u00a0delivered materials and semi-finished goods; the central zone is reserved for\u00a0assembly operations; and the southern section contains the storage area for finished\u00a0products prior to shipping. The circular footprint of the building permits the delivery\u00a0and loading of goods in completely different locations, so that the flow of traffic\u00a0inside the hall is reduced, optimized and simplified. The assembly zone in the middle\u00a0of the building can also be variably configured to meet new requirements based on\u00a0current orders.<\/p>\n<p>A circular footprint is unusual for a factory building, but all of the conditions in Weil\u00a0favoured this solution, so that SANAA was able to convince the client to accept their\u00a0proposal. Another ideal feature of the circular structure is the proportional\u00a0relationship of the fa\u00e7ade\u2019s surface area to the volume of the interior space.\u00a0With a diameter of more than 160 metres, the round production hall \u2013 which in fact\u00a0does not circumscribe an exact circle \u2013 covers a greater surface area than any other\u00a0building on the Vitra Campus. Measuring 11.4 metres in height, the hall contains a\u00a0basement storey in the southeastern half with a spacious underground parking\u00a0garage and several auxiliary rooms. The building was erected in two stages in order\u00a0to minimize interference with daily operations. The first semi-circular structure was\u00a0erected next to the old factory, which was subsequently demolished to make room\u00a0for the corresponding second half that completed the plan.<\/p>\n<p>The fa\u00e7ade and the\u00a0diameter wall that separates the two halves of the building are made of\u00a0prefabricated concrete elements. Positioned as upright rectangles, the doublewalled\u00a0concrete elements were filled on site, thereby connecting them with one\u00a0another. Due to the enormous dimensions of the perimeter, it was unnecessary for\u00a0the individual elements to be curved. Together with the central wall, the round shape\u00a0creates a perfect, rigid structure, which contains an orthogonal steel framework in its\u00a0interior. The roof construction is supported by 9.5 metre-high steel columns\u00a0positioned in a grid based on units of 17.5 x 22.8 metres. Since the exterior concrete\u00a0walls brace the structure, it was possible to minimize the dimensions of the interior\u00a0columns.<\/p>\n<p>One of the major challenges for the architects was to find a solution for the\u00a0installation of complex building technology \u2013 electronics, ventilation, roof drainage,\u00a0fire sprinklers etc., which are distributed in different configurations throughout the\u00a0interior space \u2013 that was compatible with the filigree components of the hall\u2019s\u00a0support structure. This problem was solved with astonishing precision, resulting in an\u00a0interior that is clearly different from typical factory spaces. The architects did not\u00a0treat this interior as a multifunctional, flexible empty space within the shell of a\u00a0fa\u00e7ade, but as a central aspect of the architectural task. Every detail, right down to\u00a0the screws in the high rack storage shelving, reveals the design intentions of the\u00a0architects, who left nothing to chance. Excellent lighting conditions contribute to the\u00a0pleasant work atmosphere in the hall, provided by the close rhythm of parallel\u00a0rooflights in the ceiling. They are augmented by individual windows in the upper part\u00a0of the fa\u00e7ade. Another essential element of the interior\u2019s atmospheric quality is the\u00a0radically reductive use of colour. Various shades of grey and white define the interior\u00a0space, while the signal colours so common to typical industrial interiors are\u00a0completely absent.<\/p>\n<p>The shelving system, which is positioned in parallel rows that follow the structural\u00a0grid of the interior \u2013 along with the central wall and sparingly distributed windows \u2013\u00a0provides a means of orientation in a building with enormous dimensions. The high\u00a0rack storage system can be removed or reconfigured as needed. The loading bays\u00a0are arranged on both sides of the building in a space along the fa\u00e7ade that also\u00a0contains offices. The radial arrangement of the partition walls is almost\u00a0imperceptible due to the huge diameter of the hall. Depending on future needs,\u00a0loading bays can be transformed into offices or vice versa. A workshop for emissionintensive\u00a0or high-decibel activities is the only other enclosed room on the eastern side\u00a0of the hall; the open upper deck serves as a lounge area.<\/p>\n<p><strong>Curtain fa\u00e7ade<\/strong><br \/>\nThe design of the fa\u00e7ade, whose elements are suspended in front of the exterior\u00a0insulation on the concrete walls and encompass the entire building volume,\u00a0presented a great challenge. The fa\u00e7ade elements are made of acrylic glass with an\u00a0undulating surface, measuring 1.8 metres in width by 11 metres in height \u2013 equal to\u00a0the height of the building. The outer layer of acrylic is completely transparent, while\u00a0the inner layer is an opaque white colour. The individual panels were first cast in flat\u00a0sheets, then heated to 60 degrees Celsius and vacuum moulded to create the wave\u00a0structure. Since no manufacturer could be found who was capable of moulding such\u00a0large pieces, an oven had to be specially constructed for the purpose.<\/p>\n<p>One of the architects\u2019 main concerns was to avoid obvious visual repetition. For this\u00a0reason, three different elements with varying wave patterns of narrower and wider\u00a0folds were developed. Since the hanging panels \u2013 whose mounting hardware is\u00a0concealed \u2013 can be rotated 180 degrees and mounted on either end, this resulted in\u00a0a series of six distinct types. The aim was to arrange them in a way that avoided a\u00a0recognizably repetitive pattern and that also conformed perfectly to the openings in\u00a0the fa\u00e7ade (windows, loading bays, doors).<\/p>\n<p>Presenting a homogenous appearance from a distance, with an almost surreal aura\u00a0due to its luminous white surface, the fa\u00e7ade gains vivacity and depth the closer one\u00a0approaches. Since it is only possible to see just a part of the entire volume, the\u00a0building appears to be much smaller than it actually is. It gives an impression of\u00a0lightness and transparency, even though it allows no views into the interior. On the\u00a0contrary: the building remains an enigma, revealing almost nothing about its\u00a0function. The almost immaterial character of the factory hall is emphasized by the\u00a0fact that, from the outside, only the skin of the fa\u00e7ade \u2013 suggestive of a textile\u00a0covering \u2013 is visible, while the exterior walls, roof and structural framework remain\u00a0concealed.<\/p>\n<p>Viewed from the outside, one does not recognize \u2013 or even suspect \u2013 that the\u00a0geometry of the floor plan deviates from a perfect circle; yet perhaps this\u00a0unconformity is unconsciously perceptible. Just as SANAA avoids the use of classical\u00a0symmetry in their architecture, they frequently employ slightly distorted geometric\u00a0figures. This may recall the aesthetic concept of wabi sabi, the Japanese notion that\u00a0imperfection and aesthetic consummation are not necessarily contradictory. The\u00a0subtle shape of the \u2018Alessi Tea Set\u2019 (2004) by SANAA points in this direction. In\u00a0reference to their project for Vitra, Kazuyo Sejima and Ryue Nishizawa also spoke\u00a0about transferring some of the liveliness inherent in freehand drawing, which always\u00a0stands at the beginning of their design process, to the reality of computer\u00a0calculations. Or in their own words: \u2018My impression is that the circle, the perfect\u00a0circle, is a bit too rigid.\u2019<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Development of the Vitra Campus After 1993 \u2013 the year in which Tadao Ando\u2019s Conference Pavilion and the Fire\u00a0Station by Zaha Hadid were completed, followed by the dedication of \u00c1lvaro Siza\u2019s\u00a0factory hall one year later \u2013 no new buildings were constructed on the Vitra Campus\u00a0in Weil am Rhein for more than a decade. A new [&hellip;]<\/p>\n","protected":false},"author":109044,"featured_media":413198,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1003236],"tags":[],"class_list":["post-413197","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-architecture-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Factory Building on the Vitra Campus &#8211; ARQA<\/title>\n<meta name=\"description\" content=\"Development of the Vitra Campus After 1993 \u2013 the year in which Tadao Ando\u2019s Conference Pavilion and the Fire\u00a0Station by Zaha Hadid were completed,\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:locale\" content=\"en_US\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:type\" content=\"article\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:title\" content=\"Factory Building on the Vitra Campus &#8211; ARQA\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:description\" content=\"Development of the Vitra Campus After 1993 \u2013 the year in which Tadao Ando\u2019s Conference Pavilion and the Fire\u00a0Station by Zaha Hadid were completed,\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:url\" content=\"https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:site_name\" content=\"ARQA\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/arqa.arquitectura\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:author\" content=\"http:\/\/www.facebook.com\/comunidadarqa\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"article:published_time\" content=\"2014-04-09T16:40:14+00:00\" class=\"yoast-seo-meta-tag\" \/>\n<meta property=\"og:image\" content=\"https:\/\/arqa.com\/wp-content\/uploads\/2014\/04\/SANAA-Factory-Building_150975_master.jpg\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:height\" content=\"793\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"author\" content=\"Carolina Russo\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:creator\" content=\"@arqa_com\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:site\" content=\"@arqa_com\" class=\"yoast-seo-meta-tag\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:data1\" content=\"Carolina Russo\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" class=\"yoast-seo-meta-tag\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" class=\"yoast-seo-meta-tag\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture-en\\\/factory-building-vitra-campus.html#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture-en\\\/factory-building-vitra-campus.html\"},\"author\":{\"name\":\"Carolina Russo\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/f809643de7231de9d89e995e120f6312\"},\"headline\":\"Factory Building on the Vitra Campus\",\"datePublished\":\"2014-04-09T16:40:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture-en\\\/factory-building-vitra-campus.html\"},\"wordCount\":2020,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture-en\\\/factory-building-vitra-campus.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2014\\\/04\\\/SANAA-Factory-Building_150975_master.jpg\",\"articleSection\":[\"Architecture_\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/arqa.com\\\/en\\\/architecture-en\\\/factory-building-vitra-campus.html#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture-en\\\/factory-building-vitra-campus.html\",\"url\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture-en\\\/factory-building-vitra-campus.html\",\"name\":\"Factory Building on the Vitra Campus &#8211; ARQA\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture-en\\\/factory-building-vitra-campus.html#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture-en\\\/factory-building-vitra-campus.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2014\\\/04\\\/SANAA-Factory-Building_150975_master.jpg\",\"datePublished\":\"2014-04-09T16:40:14+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/f809643de7231de9d89e995e120f6312\"},\"description\":\"Development of the Vitra Campus After 1993 \u2013 the year in which Tadao Ando\u2019s Conference Pavilion and the Fire\u00a0Station by Zaha Hadid were completed,\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture-en\\\/factory-building-vitra-campus.html#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/arqa.com\\\/en\\\/architecture-en\\\/factory-building-vitra-campus.html\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture-en\\\/factory-building-vitra-campus.html#primaryimage\",\"url\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2014\\\/04\\\/SANAA-Factory-Building_150975_master.jpg\",\"contentUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/2014\\\/04\\\/SANAA-Factory-Building_150975_master.jpg\",\"width\":1200,\"height\":793},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture-en\\\/factory-building-vitra-campus.html#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Architecture_\",\"item\":\"https:\\\/\\\/arqa.com\\\/en\\\/architecture-en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Factory Building on the Vitra Campus\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#website\",\"url\":\"https:\\\/\\\/arqa.com\\\/\",\"name\":\"ARQA\",\"description\":\"Comunidad de Arquitectura y Dise\u00f1o\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/arqa.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/arqa.com\\\/#\\\/schema\\\/person\\\/f809643de7231de9d89e995e120f6312\",\"name\":\"Carolina Russo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/avatars\\\/109044\\\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg\",\"url\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/avatars\\\/109044\\\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg\",\"contentUrl\":\"https:\\\/\\\/arqa.com\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/avatars\\\/109044\\\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg\",\"caption\":\"Carolina Russo\"},\"description\":\"Editora de Contenidos ARQA\",\"sameAs\":[\"http:\\\/\\\/www.facebook.com\\\/comunidadarqa\",\"https:\\\/\\\/x.com\\\/arqa_com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Factory Building on the Vitra Campus &#8211; ARQA","description":"Development of the Vitra Campus After 1993 \u2013 the year in which Tadao Ando\u2019s Conference Pavilion and the Fire\u00a0Station by Zaha Hadid were completed,","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html","og_locale":"en_US","og_type":"article","og_title":"Factory Building on the Vitra Campus &#8211; ARQA","og_description":"Development of the Vitra Campus After 1993 \u2013 the year in which Tadao Ando\u2019s Conference Pavilion and the Fire\u00a0Station by Zaha Hadid were completed,","og_url":"https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html","og_site_name":"ARQA","article_publisher":"https:\/\/www.facebook.com\/arqa.arquitectura","article_author":"http:\/\/www.facebook.com\/comunidadarqa","article_published_time":"2014-04-09T16:40:14+00:00","og_image":[{"width":1200,"height":793,"url":"https:\/\/arqa.com\/wp-content\/uploads\/2014\/04\/SANAA-Factory-Building_150975_master.jpg","type":"image\/jpeg"}],"author":"Carolina Russo","twitter_card":"summary_large_image","twitter_creator":"@arqa_com","twitter_site":"@arqa_com","twitter_misc":{"Written by":"Carolina Russo","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html#article","isPartOf":{"@id":"https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html"},"author":{"name":"Carolina Russo","@id":"https:\/\/arqa.com\/#\/schema\/person\/f809643de7231de9d89e995e120f6312"},"headline":"Factory Building on the Vitra Campus","datePublished":"2014-04-09T16:40:14+00:00","mainEntityOfPage":{"@id":"https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html"},"wordCount":2020,"commentCount":0,"image":{"@id":"https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html#primaryimage"},"thumbnailUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2014\/04\/SANAA-Factory-Building_150975_master.jpg","articleSection":["Architecture_"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html","url":"https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html","name":"Factory Building on the Vitra Campus &#8211; ARQA","isPartOf":{"@id":"https:\/\/arqa.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html#primaryimage"},"image":{"@id":"https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html#primaryimage"},"thumbnailUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2014\/04\/SANAA-Factory-Building_150975_master.jpg","datePublished":"2014-04-09T16:40:14+00:00","author":{"@id":"https:\/\/arqa.com\/#\/schema\/person\/f809643de7231de9d89e995e120f6312"},"description":"Development of the Vitra Campus After 1993 \u2013 the year in which Tadao Ando\u2019s Conference Pavilion and the Fire\u00a0Station by Zaha Hadid were completed,","breadcrumb":{"@id":"https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html#primaryimage","url":"https:\/\/arqa.com\/wp-content\/uploads\/2014\/04\/SANAA-Factory-Building_150975_master.jpg","contentUrl":"https:\/\/arqa.com\/wp-content\/uploads\/2014\/04\/SANAA-Factory-Building_150975_master.jpg","width":1200,"height":793},{"@type":"BreadcrumbList","@id":"https:\/\/arqa.com\/en\/architecture-en\/factory-building-vitra-campus.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Architecture_","item":"https:\/\/arqa.com\/en\/architecture-en"},{"@type":"ListItem","position":2,"name":"Factory Building on the Vitra Campus"}]},{"@type":"WebSite","@id":"https:\/\/arqa.com\/#website","url":"https:\/\/arqa.com\/","name":"ARQA","description":"Comunidad de Arquitectura y Dise\u00f1o","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/arqa.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/arqa.com\/#\/schema\/person\/f809643de7231de9d89e995e120f6312","name":"Carolina Russo","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arqa.com\/wp-content\/uploads\/sites\/3\/avatars\/109044\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg","url":"https:\/\/arqa.com\/wp-content\/uploads\/sites\/3\/avatars\/109044\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg","contentUrl":"https:\/\/arqa.com\/wp-content\/uploads\/sites\/3\/avatars\/109044\/7b1c962c1b791694e5e21eb05b3e88d0-bpfull.jpg","caption":"Carolina Russo"},"description":"Editora de Contenidos ARQA","sameAs":["http:\/\/www.facebook.com\/comunidadarqa","https:\/\/x.com\/arqa_com"]}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts\/413197","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/users\/109044"}],"replies":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/comments?post=413197"}],"version-history":[{"count":0,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/posts\/413197\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/media\/413198"}],"wp:attachment":[{"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/media?parent=413197"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/categories?post=413197"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arqa.com\/en\/wp-json\/wp\/v2\/tags?post=413197"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}